The Picturesque Loch Lomond benefits from Flex MSE retaining wall

The 3 tiered walls built with the eco-friendly Flex MSE retaining wall system support the 3 pylons running up the hill at various points. The complex build had to take into consideration the turbulent weather conditions as well as the steep / slippery hills , minimal access and underground running Scottish power cables which have all been integrated into / behind the system with ease.
Project: Loch Lomond Sloy Switching station
Construction Time: 2-4 weeks
Flex MSE Units: 2,376 M2: 183
Type of Install: 3 tiered Reinforced Stretcher Bond Flex MSE Retaining Wall
Vegetation Solution: Hydroseeded
Pre-Vegetated Installation:-



The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.

Gleeson Homes looks to Sustainable Retaining Walls

Lancashire Council Endorses Flex MSE for Road Support

Essex Council Adopts Flex MSE for Flood Protection

Bellway Homes Specifies Flex MSE on Housing Development in Liverpool

Union Canal, Scotland chooses Flex MSE for Retaining wall

HydroSack® supports construction site from foul water entering public watercourse

Marriott Hotel finds flood protection solution for floodwater damage with HydroSack® and HydroSnake®

Fife Council invest in Flood protection range of products

HydroSack® supports Witton from freak storms and flash flooding
Somerset District Council provide flood protection initiative for over 3,000 effected by the recent floods.

Hammersmith & Fulham Council switch to an alternative, affordable, more sustainable solution for flood protection

Dumfries & Galloway Council confirm alternative to sandbags for flooding protection

Hammersmith & Fulham Council