Damaged path requires Flex MSE stability
Project: F2873 Llanelli, South wales
Installation Team: Gravitas International
Construction Time: 1-2 Weeks
Flex MSE Units: 601 M2: 46.2
Type of Install: Flex MSE retaining wall to support a Footpath
Vegetation Solution: Hydroseeded
The damaged path required stability and a much needed face list with the Flex MSE system offering a green aesthetic front facing to support the path so it wasn't such an eye sore for locals. After a 2 week installation and already having been hydro-seeded the system will fully vegetate this summer an offer a beautiful green retaining wall that blends seamlessly into its natural surroundings.
The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.