Flex MSE Bridge repair works in Peterborough


The damaged bridge was requiring a much needed face lift with the Flex MSE system stepping up to play, offering a front facing to the concrete that will provide a green aesthetic finish once vegetated.
Project: F2752 Milestone New Road, Whittlesey
Installation Team: Gravitas International
Construction Time: 1-2 Weeks
Flex MSE Units: 1,972 M2: 152
Type of Install: Reinforced Concrete Facing
Vegetation Solution: Hydroseeded

The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.


Gleeson Homes looks to Sustainable Retaining Walls

Lancashire Council Endorses Flex MSE for Road Support

Essex Council Adopts Flex MSE for Flood Protection

Bellway Homes Specifies Flex MSE on Housing Development in Liverpool

Union Canal, Scotland chooses Flex MSE for Retaining wall

HydroSack® supports construction site from foul water entering public watercourse

Marriott Hotel finds flood protection solution for floodwater damage with HydroSack® and HydroSnake®

Fife Council invest in Flood protection range of products

HydroSack® supports Witton from freak storms and flash flooding
Somerset District Council provide flood protection initiative for over 3,000 effected by the recent floods.

Hammersmith & Fulham Council switch to an alternative, affordable, more sustainable solution for flood protection

Dumfries & Galloway Council confirm alternative to sandbags for flooding protection

Hammersmith & Fulham Council