Flex MSE Bridge repair works in Peterborough
The damaged bridge was requiring a much needed face lift with the Flex MSE system stepping up to play, offering a front facing to the concrete that will provide a green aesthetic finish once vegetated.
Project: F2752 Milestone New Road, Whittlesey
Installation Team: Gravitas International
Construction Time: 1-2 Weeks
Flex MSE Units: 1,972 M2: 152
Type of Install: Reinforced Concrete Facing
Vegetation Solution: Hydroseeded
The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.