Lancashire Council Endorses Flex MSE for Road Support
Not only does the system support a stream, as well as having safety marker posts incorporated into the design, Flex MSE also supports variable surcharge loads, taking into consideration the road and passing vehicles.
Boasting a 120 year design life, the installation of Flex MSE caused minimal disruption to the traffic and in less than 3 months will be fully vegetated, blending seamlessly into the surroundings.
Project Ref: F3332
Construction Time: 2 Weeks
Flex MSE Units: 3,146
M²: 242
Type of Install: Reinforced Flex MSE Stretcher Bond Retaining Wall
Vegetation Solution: Hydroseeded
Did you know, because Flex MSE is inert, it doesn't matter whether you’re installing it on land, in freshwater, or even in seawater, the 120 year design life and 75 year warranty are totally unaffected.
The above Project is currently in progress, with it either being at phase 1 of installation, phase 2 of installation, pre-hydroseeded or post-hydroseeded. Please return in 4-6 months to view the completed, fully vegetated case study.